Contractors & general contractors

The draw waits on paperwork.
So the money waits too.

Change orders agreed verbally, photos spread across three phones, an invoice pack assembled the night before the draw. The work is done; the file is not.

Build Your Agent See the jobs
A job site, dailyDaily
07:00Change order · written and dated2 filed
07:30Photos · filed by location and date61 filed
12:00Submittal · tracked to due date1 due
16:00Draw pack · assembled from the recordready
17:00Quote · from the takeoffdraft
You sign every change orderFiled by address, not by phone
—
No published number
for this vertical yet
5 days
To measure before
anything is built
1
Job built first
before anything else
0
Figures published
without a method
01 / The jobs

Four jobs, all of them between you and the draw.

01
Change orders

Written the day it happened

The verbal change becomes a document with a date, a scope, a price and a signature line, while the job is open.

Because the alternative is absorbing it.

dated
While the job is open
In build
02
Job file

Photos filed by location and date

Every photo lands under the job and the location, so the one the inspector asks for is findable in seconds.

Filed as the crew takes them, not the night before the meeting.

per job
Filed as taken
In build
03
Draws

The pack, assembled from the record

Invoices, lien waivers, photos and progress assembled into the draw pack from what is already on file.

Missing items are named before submission, not after rejection.

from record
Gaps named first
In build
04
Quotes

From the takeoff you already did

Quantities become a priced quote against your own rate sheet, formatted the way the client expects.

You set the margin. The arithmetic is done.

draft
Your rates
In build
02 / The honest part

No measured GC engagement is published, so there is no figure here.

Change-order leakage and draw delays are the two claims everybody makes. We will measure both on your jobs before we claim either.

FIRST

We map your systems and find which of these jobs is costing you the most hours.

THEN

We build that one, put it in front of the person who owns it, and time it before and after.

ONLY THEN

The figure goes on this page, labelled MEASURED, with the method under it. Not before.

03 / The method, proved elsewhere

The same discipline, on work we have already done.

01
Our own operation

32 agents, running daily

Two inboxes read on a schedule, deadlines recalculated, documents filed — every number taken off our own logs.

3,781 / day
Runs, measured
Measured
02
Commercial brokerage

The twenty-hour listing

Preparation modelled from the broker's own task list, arrived at independently within 5% of his estimate.

19.25 → 4.05 h
Per listing
Modelled
03
Public records

Portals that have no API

A search box and one record at a time, driven end to end and re-checked against the source page.

22.8 s / record
Three states, timed
Measured
Start here

Tell us which draw is waiting on paper.

Build Your Agent